CONTEXT OF THE PROJECT
As a result of the project “Cause – Root Analysis of the remote Separator in the Akal-H Satellite Platform”, BFC Consulting carried out the simulation in stationary regime of the separator of remote oil FA-1102 in the Akal-H Satellite Platform to subsequently develop a model of Dynamic Simulation of process for evaluation of scenarios of risk derived from the Cause – Root Analysis (CRA).
OBJECTIVE
Develop a model of stationary simulation of the remote separator FA-1102 of the Akal-H satellite Platform with the purpose of updating the process flow diagrams (PFD) and dispose of information to develop a model of simulation in dynamic regime, which will be used to establish and evaluate risk scenarios derived from the CRA.
TECHNICAL CONTEXT
Implement a stationary and dynamic simulation model through the use of specialized commercial software PRO II and Dynsim for the remote separator FA-1102 of the Akal-H satellite platform.
Risk scenarios / interest critics were simulated dynamically to evaluate the response of the process and its control according to the significant deviations that could result from such risk scenarios. It should be mentioned that such risk scenarios were derived from the Cause – Root Analysis (CRA) and served as support in the decision making intended to support such analysis.
RESULTS OBTAINED
The dynamic regime model precisely supported decision making intended to support the scenarios derived from the Cause – Root Analysis (CRA) developed as a result of the accident in the remote separator FA-1102 of the Akal-H satellite Platform.
STUDY AND ANALYSIS OF DISPERSION OF GASES FOR LOCATION OF SENSORS OF THE FIRE AND GAS SYSTEM OF THE C.P. AKAL-B.
STUDY AND ANALYSIS OF DISPERSION OF GASES FOR LOCATION OF SENSORS OF THE FIRE AND GAS SYSTEM OF THE C.P. AKAL-B.
As a result of the modernization of the facilities in the Gulf of Mexico, there is a need for a Fire and Gas System.
See more
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. EK-A.
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. EK-A.
As a result of the Modernization of the Safety systems, auxiliary services and the air network of the Instruments on the Ek-A Perforation platform.
See more
HYDRAULIC ANALYSIS AND DETERMINATION OF DEGREE OF FIRE OF THE C.P. AKAL-B.
HYDRAULIC ANALYSIS AND DETERMINATION OF DEGREE OF FIRE OF THE C.P. AKAL-B.
The AKAL-B Complex is made up of different platforms that have a seawater based fire protection system.
See more
UPDATING OF THE PROCESS RISK ANALYSIS (PARA) FOR THE REHABILITATION OF SYSTEMS AND EQUIPMENT FOR ESTABLISHING THE SAFE OPERATION OF THE BALAM-TE PLATFORM.
UPDATING OF THE PROCESS RISK ANALYSIS (PARA) FOR THE REHABILITATION OF SYSTEMS AND EQUIPMENT FOR ESTABLISHING THE SAFE OPERATION OF THE BALAM-TE PLATFORM.
According to the commitments, current and future oil production demand and in order to maintain the levels of production.
See more
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE OCEAN STAR VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE OCEAN STAR VESSEL.
Develop the technical studies to comply with the current regulation of PEMEX.
See more
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. AKAL-B.
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. AKAL-B.
As a result of the electromechanical works that will be carried out in the Akal-B Process Center (C.P. Akal-B.) for the management of production.
See more
PROCESS HAZARD ANALYSIS (PHA) OF INSTALLATIONS IN THE CUERVITO AND FRONTERIZO BLOCKS.
PROCESS HAZARD ANALYSIS (PHA) OF INSTALLATIONS IN THE CUERVITO AND FRONTERIZO BLOCKS.
To prepare the process hazard analysis (PHA) and define its scope in the development of techniques for risk identification.
See more
SPECIALIZED TECHNICAL STUDIES FOR THE REGULATORY COMPLIANCE OF THE VOLANTIS VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR THE REGULATORY COMPLIANCE OF THE VOLANTIS VESSEL.
The VOLANTIS vessel has an extensive global history in carrying out comprehensive construction.
See more
UPDATING OF HYDRAULIC CALCULATION OF THE PROTECTION FROM FIRE OF THE ABK-A COMPRESSION PLATFORM.
UPDATING OF HYDRAULIC CALCULATION OF THE PROTECTION FROM FIRE OF THE ABK-A COMPRESSION PLATFORM.
The Abkatun-A Compression platform has a Fire Protection System based on seawater.
See more
RISK ANALYSIS FOR THE SEMISUBMERSIBLE SEMI 1 PLATFORM.
RISK ANALYSIS FOR THE SEMISUBMERSIBLE SEMI 1 PLATFORM.
The Semi-submergible (PSS) SEMI 1 Platform is designed to provide maintenance and rehabilitation support to installations.
See more
STUDY FOR VERIFICATION AND VALIDATION OF RADIUS OF COVERAGE FOR THE PLACING OF DETECTORS OF THE FIRE AND GAS SYSTEM OF THE ABK-A COMPRESSION PLATFORM.
STUDY FOR VERIFICATION AND VALIDATION OF RADIUS OF COVERAGE FOR THE PLACING OF DETECTORS OF THE FIRE AND GAS SYSTEM OF THE ABK-A COMPRESSION PLATFORM.
As a result of the modernization of the facilities in the Gulf of Mexico, there is a need for a Fire and Gas System.
See more
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE SAPURA 3500 VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE SAPURA 3500 VESSEL.
Develop the technical studies to comply with the current regulation of PEMEX.
See more
FUNCTIONAL SAFETY LIFE CYCLE FOR THE STARTUP OF THE ABKATUN-A COMPRESSION PLATFORM WITH THE MODULES 1 AND 2 OF THE ABKATUN-A COMPLEX.
FUNCTIONAL SAFETY LIFE CYCLE FOR THE STARTUP OF THE ABKATUN-A COMPRESSION PLATFORM WITH THE MODULES 1 AND 2 OF THE ABKATUN-A COMPLEX.
As a result of the startup of operations of the Abkatun-A Compression platform with modules 1 and 2 belonging to the Abkatun-A Complex.
See more
STUDY OF IDENTIFICATION OF HAZARDS FOR THE DETERMINATION OF THE SAFETY INTEGRITY LEVEL (SIL OBJECTIVE) USING LOPA FOR THE NEW PLANTS.
STUDY OF IDENTIFICATION OF HAZARDS FOR THE DETERMINATION OF THE SAFETY INTEGRITY LEVEL (SIL OBJECTIVE) USING LOPA FOR THE NEW PLANTS.
PEMEX intends to reconfigure the units of Hydrodesulfurization of Intermediate Distillates U-7, U-8 and U-14.
See more
DYNAMIC SIMULATION STUDY FOR THE CAUSE – ROOT ANALYSIS OF THE REMOTE SEPARATOR ON THE AKAL-H SATELLITE PLATFORM.
DYNAMIC SIMULATION STUDY FOR THE CAUSE – ROOT ANALYSIS OF THE REMOTE SEPARATOR ON THE AKAL-H SATELLITE PLATFORM.
BFC Consulting did the simulation in stationary regime of the remote oil separator FA-1102 in the Akal-H Satellite Platform.
See more
COMPREHENSIVE RISK STUDY FOR THE PHTHALIC ANHYDRIDE PLANT.
COMPREHENSIVE RISK STUDY FOR THE PHTHALIC ANHYDRIDE PLANT.
The primary purpose of this Safety Integrity Level (SIL) analysis is to identify the Safety Instrumented Functions (SIF).
See more
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE BLUE COMMANDER VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE BLUE COMMANDER VESSEL.
Develop the technical studies to comply with the current regulation of PEMEX.
See more