CONTEXT OF THE PROJECT
According to commitments and current and future demand for oil production and in order to maintain production levels, it is necessary to establish the general requirements for reestablishing the operative conditions of the systems and equipment damaged on the Balam-TE Platform.
To reestablish the safe operation of the installations, a detailed quantification must be done of the risks to the supply, installation and startup of the systems of the Balam-TE Platform in safe conditions for the personnel and for the installation.
OBJECTIVE
Process Hazard Analysis (PHA) through methodologies for identification of hazards HazOp and What If? for the Rehabilitation of Systems and Equipment for reestablishing the Safe Operation of the Balam-TE Platform, located in the Gulf of Mexico, in which the possible risk scenarios during the operation and related activities are identified, thereby minimizing the occurrence of damages associated with failures in the systems and human factors, in order to control and/or minimize the consequences that affect the Personnel, the Population, the Environment, the Production and/or Installation based on the current regulations.
TECHNICAL CONTEXT
Based on the applicable regulations for doing a Process Hazard Analysis (PHA), the multidisciplinary working group was formed for the identification of Hazards and ranking of risks, the scenarios were identified that are subject to the analysis of estimation of consequences through the specialized commercial software PHAST, and analysis of frequencies through the event trees methodology, this serving as a basis for the re-ranking of the risk, finally resulting in the establishment of a series of recommendations for risk management.
RESULTS OBTAINED
In order to establish a comprehensive system for risk management, a qualitative and quantitative quantification was done of the inherent and managed risks in the Balam-TE Platform in order to identify and assess their impact on the risk receptors of interest and establish a series of recommendations intended to maintain and reduce to a tolerable level the risks present during the supply, installation and startup of the systems of the Balam-TE Platform.
STUDY AND ANALYSIS OF DISPERSION OF GASES FOR LOCATION OF SENSORS OF THE FIRE AND GAS SYSTEM OF THE C.P. AKAL-B.
STUDY AND ANALYSIS OF DISPERSION OF GASES FOR LOCATION OF SENSORS OF THE FIRE AND GAS SYSTEM OF THE C.P. AKAL-B.
As a result of the modernization of the facilities in the Gulf of Mexico, there is a need for a Fire and Gas System.
See more
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. EK-A.
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. EK-A.
As a result of the Modernization of the Safety systems, auxiliary services and the air network of the Instruments on the Ek-A Perforation platform.
See more
HYDRAULIC ANALYSIS AND DETERMINATION OF DEGREE OF FIRE OF THE C.P. AKAL-B.
HYDRAULIC ANALYSIS AND DETERMINATION OF DEGREE OF FIRE OF THE C.P. AKAL-B.
The AKAL-B Complex is made up of different platforms that have a seawater based fire protection system.
See more
UPDATING OF THE PROCESS RISK ANALYSIS (PARA) FOR THE REHABILITATION OF SYSTEMS AND EQUIPMENT FOR ESTABLISHING THE SAFE OPERATION OF THE BALAM-TE PLATFORM.
UPDATING OF THE PROCESS RISK ANALYSIS (PARA) FOR THE REHABILITATION OF SYSTEMS AND EQUIPMENT FOR ESTABLISHING THE SAFE OPERATION OF THE BALAM-TE PLATFORM.
According to the commitments, current and future oil production demand and in order to maintain the levels of production.
See more
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE OCEAN STAR VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE OCEAN STAR VESSEL.
Develop the technical studies to comply with the current regulation of PEMEX.
See more
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. AKAL-B.
FUNCTIONAL SAFETY LIFE CYCLE FOR SAFETY INSTRUMENTED FUNCTIONS OF THE EMERGENCY SHUTDOWN SYSTEM IN C.P. AKAL-B.
As a result of the electromechanical works that will be carried out in the Akal-B Process Center (C.P. Akal-B.) for the management of production.
See more
PROCESS HAZARD ANALYSIS (PHA) OF INSTALLATIONS IN THE CUERVITO AND FRONTERIZO BLOCKS.
PROCESS HAZARD ANALYSIS (PHA) OF INSTALLATIONS IN THE CUERVITO AND FRONTERIZO BLOCKS.
To prepare the process hazard analysis (PHA) and define its scope in the development of techniques for risk identification.
See more
SPECIALIZED TECHNICAL STUDIES FOR THE REGULATORY COMPLIANCE OF THE VOLANTIS VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR THE REGULATORY COMPLIANCE OF THE VOLANTIS VESSEL.
The VOLANTIS vessel has an extensive global history in carrying out comprehensive construction.
See more
UPDATING OF HYDRAULIC CALCULATION OF THE PROTECTION FROM FIRE OF THE ABK-A COMPRESSION PLATFORM.
UPDATING OF HYDRAULIC CALCULATION OF THE PROTECTION FROM FIRE OF THE ABK-A COMPRESSION PLATFORM.
The Abkatun-A Compression platform has a Fire Protection System based on seawater.
See more
RISK ANALYSIS FOR THE SEMISUBMERSIBLE SEMI 1 PLATFORM.
RISK ANALYSIS FOR THE SEMISUBMERSIBLE SEMI 1 PLATFORM.
The Semi-submergible (PSS) SEMI 1 Platform is designed to provide maintenance and rehabilitation support to installations.
See more
STUDY FOR VERIFICATION AND VALIDATION OF RADIUS OF COVERAGE FOR THE PLACING OF DETECTORS OF THE FIRE AND GAS SYSTEM OF THE ABK-A COMPRESSION PLATFORM.
STUDY FOR VERIFICATION AND VALIDATION OF RADIUS OF COVERAGE FOR THE PLACING OF DETECTORS OF THE FIRE AND GAS SYSTEM OF THE ABK-A COMPRESSION PLATFORM.
As a result of the modernization of the facilities in the Gulf of Mexico, there is a need for a Fire and Gas System.
See more
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE SAPURA 3500 VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE SAPURA 3500 VESSEL.
Develop the technical studies to comply with the current regulation of PEMEX.
See more
FUNCTIONAL SAFETY LIFE CYCLE FOR THE STARTUP OF THE ABKATUN-A COMPRESSION PLATFORM WITH THE MODULES 1 AND 2 OF THE ABKATUN-A COMPLEX.
FUNCTIONAL SAFETY LIFE CYCLE FOR THE STARTUP OF THE ABKATUN-A COMPRESSION PLATFORM WITH THE MODULES 1 AND 2 OF THE ABKATUN-A COMPLEX.
As a result of the startup of operations of the Abkatun-A Compression platform with modules 1 and 2 belonging to the Abkatun-A Complex.
See more
STUDY OF IDENTIFICATION OF HAZARDS FOR THE DETERMINATION OF THE SAFETY INTEGRITY LEVEL (SIL OBJECTIVE) USING LOPA FOR THE NEW PLANTS.
STUDY OF IDENTIFICATION OF HAZARDS FOR THE DETERMINATION OF THE SAFETY INTEGRITY LEVEL (SIL OBJECTIVE) USING LOPA FOR THE NEW PLANTS.
PEMEX intends to reconfigure the units of Hydrodesulfurization of Intermediate Distillates U-7, U-8 and U-14.
See more
DYNAMIC SIMULATION STUDY FOR THE CAUSE – ROOT ANALYSIS OF THE REMOTE SEPARATOR ON THE AKAL-H SATELLITE PLATFORM.
DYNAMIC SIMULATION STUDY FOR THE CAUSE – ROOT ANALYSIS OF THE REMOTE SEPARATOR ON THE AKAL-H SATELLITE PLATFORM.
BFC Consulting did the simulation in stationary regime of the remote oil separator FA-1102 in the Akal-H Satellite Platform.
See more
COMPREHENSIVE RISK STUDY FOR THE PHTHALIC ANHYDRIDE PLANT.
COMPREHENSIVE RISK STUDY FOR THE PHTHALIC ANHYDRIDE PLANT.
The primary purpose of this Safety Integrity Level (SIL) analysis is to identify the Safety Instrumented Functions (SIF).
See more
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE BLUE COMMANDER VESSEL.
SPECIALIZED TECHNICAL STUDIES FOR REGULATORY COMPLIANCE OF THE BLUE COMMANDER VESSEL.
Develop the technical studies to comply with the current regulation of PEMEX.
See more